7hrs or 45 minutes, sounds like the rear rh exhaust manifold bolt on a p38, lol.
I remember the first set of heads I did on one of mine, I was determined to get all the heat shield bolts, took 2 days, not any more, 20 minutes both sides
Late 2000 4.6 vouge, 20" khans, running lpg. Exchange LR engine with low miles.
2.5 dse sold oct 2015
1997 green 4.6 vouge, sold Feb 2014
1997 blue 4.6 vouge, sold June 2013
1992 blue 3.9 classis, gave away 2010
1989 gold 3.5 classic, sold 2006
Etc etc missed out lots, on 14th Range Rover
Nano evo, Thor , dse, EAS kicker..